MSM Engineering& Construction Pte Ltd

Tiling · Central Region

Tile Removal in China Square

Remove wall or floor tiles to an agreed preparation stage.

What this job involves

Remove wall or floor tiles to an agreed preparation stage.

Assessment before agreeing the work

Check substrate type, services, adjoining finishes and wet-area membranes.

Scope to confirm in the quotation

Agree removal, disposal and the scope of substrate making good.

Information to send: Tiled area, wall or floor construction and the intended next finish.

How the cost is assessed

A durable tile finish depends on the surface beneath it as well as the tile itself. The assessment should consider soundness, levels, movement joints, falls and the transition to adjoining finishes. Agree the tile size, layout and edge details before a final material quantity is calculated.

  • Area, tile dimensions and layout complexity
  • Condition and preparation of the existing substrate
  • Removal requirements and adjacent surface protection
  • Adhesive, grout, trims, movement joints and curing time

The final scope and price depend on the site assessment, quantities, chosen materials and agreed exclusions. Ask for an itemised quotation rather than assuming a standard rate covers every condition.

Before the site visit

  • Record room dimensions and photograph thresholds and corners.
  • Confirm whether spare matching tiles are available.
  • Share any history of hollow sounds, cracks, leaks or loose tiles.

Check the building’s renovation conditions before hacking or changing floor levels. Wet-area tiling can affect waterproofing and drainage falls. For HDB premises, verify applicable permit and renovation requirements with an appropriately registered contractor.

Check the completed work

Inspect removal boundaries, remaining material and the agreed substrate condition.

Agree which records, material details and follow-up items will be handed over. Record any area outside the agreed scope so it is clear what has been inspected and what still needs attention.

Planning the work in China Square

Location referenceChina Square (subzone)
Planning areaOutram
RegionCentral Region
Nearby area guidesPhillip, Boat Quay, Raffles Place, Chinatown

For this China Square enquiry, include the exact building and unit, premises type and access contact. Ask the building representative about loading arrangements, lift protection, permitted work periods and waste collection before agreeing the schedule. These details are specific to the building and cannot be established from the area name alone.

Area names and boundaries use the URA Master Plan 2019 dataset as a geographic reference. Confirm your exact address and building requirements with the team.

View China Square on a map · All work guides for China Square

Prepare your quotation request

Fill in the site details to prepare a WhatsApp message. Review it and press Send in WhatsApp to contact MSM. This page does not store your enquiry.

Open WhatsApp directly · Call +65 8949 4317

Questions before you book

What should I send for a tile removal quotation?

Tiled area, wall or floor construction and the intended next finish. Include the exact China Square address and any building-access restrictions.

Can a quotation be confirmed from photographs alone?

Photographs help define the enquiry, but hidden conditions and installation details may require an on-site assessment. Check substrate type, services, adjoining finishes and wet-area membranes.

How is the final work checked?

Inspect removal boundaries, remaining material and the agreed substrate condition. Confirm the inspection method and included making-good work in the written scope.

Other work in China Square